Projet immobilier L’Aventura Projet immobilier L’Aventura

Quebec City (2016)

L’Aventura Housing Estate Development

Centurion Fondation is participating in the different phases of L’Aventura housing estate development project by performing design, build and site monitoring activities for various types of deep foundation work.

Client : Groupe Huot General Contractor: Millenum Construction

  • L’Aventura Housing Estate Development
  • L’Aventura Housing Estate Development
  • L’Aventura Housing Estate Development
Construction du nouveau Complexe de la Santé, à Sherbrooke Construction du nouveau Complexe de la Santé, à Sherbrooke

Sherbrooke (2016)

Complexe de la Santé Health Complex

Centurion Fondation designed and installed three (3) metal sheet pile retaining walls and some 500 driven tubular piles for the construction of the new Complexe de la Santé health complex in Sherbrooke.

Client : IMEX Société immobilière General Contractor: Longer

  • Health Complex
  • Health Complex
Pile installation for the Rio Tinto plant agglomerator Pile installation for the Rio Tinto plant agglomerator

Sorel (2016)

Pile installation for the Rio Tinto plant agglomerator

Centurion designed and installed 32 driven tubular friction piles.

Client : Rio Tinto General Contractor: Rio Tinto

Logements Courchevel Logements Courchevel

Lévis (2016)

Logements Courchevel Apartments

Centurion Fondation designed and installed the driven tubular piles and rock anchors underlying the new Logements Courchevel building in Lévis.

Client : Investissements Invest General Contractor: Dureco Construction

  • Logements Courchevel Apartments
  • Logements Courchevel Apartments
Remplacement du pont P-02273, Saint-Félix-de-Kingsey Remplacement du pont P-02273, Saint-Félix-de-Kingsey

Saint-Félix-de-Kingsey (2016)

Replacement of bridge P-02273 on Chemin du Plateau

Centurion drove the 20 tubular piles needed to install the bridge.

Client : MTQ General Contractor: Longer

  • Replacement of bridge P-02273 on Chemin du Plateau
Atomisateur d’acier à l’usine de Rio Tinto Atomisateur d’acier à l’usine de Rio Tinto

Sorel (2016)

Pile installation for Rio Tinto plan steel sprayer

Centurion designed and installed the 12 driven tubular friction piles.

Client : Rio Tinto General Contractor: Rio Tinto

  • Pile installation for Rio Tinto plan steel sprayer
Façades du Mesnil Blocs E et F Façades du Mesnil Blocs E et F

Quebec City (2016)

Les Façades du Mesnil Blocs E et F

Centurion Fondation designed and installed the 500 or so driven tubular piles that support wings E and F of the new residential development known as Les Façades du Mesnil.

Client : Groupe Huot General Contractor: Millenum Construction

  • Façades du Mesnil Blocs E et F
Remplacement du pont P-05365, Saint-Wenceslas Remplacement du pont P-05365, Saint-Wenceslas

Saint-Wenceslas (2016)

Replacement of bridge P-05365 on country road 9e Rang Est

Centurion installed 28 driven tubular pilings.

Client : MTQ General Contractor: Expertise C4

  • Replacement of bridge P-05365 on country road 9e Rang Est
Construction du pont P-16945, Saint-Zéphirin Construction du pont P-16945, Saint-Zéphirin

Saint-Zéphirin (2016)

Construction of bridge P-16945 on country road Rang Saint-François

Centurion installed 42 driven tubular piles.

Client : MTQ General Contractor: Longer

  • Construction of bridge P-16945 on country road Rang Saint-François
  • Construction of bridge P-16945 on country road Rang Saint-François
Construction du pont P-17184, Sainte-Perpétue Construction du pont P-17184, Sainte-Perpétue

Sainte-Perpétue (2016)

Construction of bridge P-17184 on country road Rang Sainte-Marie

Centurion installed 28 driven tubular piles.

Client : MTQ General Contractor: Lambert et Grenier

  • Construction of bridge P-17184 on country road Rang Sainte-Marie

Quebec City (2016)

Temporary retaining walls at the National Assembly

Centurion Fondation designed and built two Berliner-type retaining walls for the excavation work required for the National Assembly expansion project.

Client : Pomerleau / Assemblée nationale General Contractor: Les constructions BÉ-CON

  • Temporary retaining walls at the National Assembly
  • Temporary retaining walls at the National Assembly
Usine Kruger Usine Kruger

Trois-Rivières (2016)

Testing of static load on existing timber piles at the Kruger plant

Centurion Fondation performed static load tests on timber piles approximately 100 years old.

Client : Englobe General Contractor: Kruger

  • Usine Kruger
Fondation Complexe Synergia Fondation Complexe Synergia

Saint-Hyacinthe (2016)

Complexe Synergia complex

Centurion Fondation designed and installed the driven tubular piles and rock anchors underlying the new Synergia complex in Saint-Hyacynthe.

Client : Groupe Robin General Contractor: Groupe Robin

  • Complexe Synergia complex
  • Complexe Synergia complex
  • Complexe Synergia complex
  • Complexe Synergia complex
Redevelopment of the Autoroute interchange Redevelopment of the Autoroute interchange

Quebec City (2015-2016)

Redevelopment of the Autoroute Félix-Leclerc (A-40) and Autoroute Laurentienne (A-73) interchange

Centurion Fondation installed 297 driven tubular piles, built three temporary metal sheet pile retaining walls and installed one Berliner-type temporary retaining wall.

Client : MTQ General Contractor: EBC

  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
  • Redevelopment of the Autoroute interchange
735 kV Line 735 kV Line

Romaine 3/4 (2015)

735 kV Line

Centurion installed the foundations for six (6) electrical pylons created by driving HP-type piles.

Client : Hydro-Québec General Contractor: GLR

  • 735 kV Line
  • 735 kV Line
  • 735 kV Line
  • 735 kV Line
Développement immobilier Loges Saint-Nicolas Développement immobilier Loges Saint-Nicolas

Lévis (2015)

Développement immobilier Loges Saint-Nicolas – Phase 1 housing development

In collaboration with the project’s consulting engineer, Centurion Fondation developed a deep foundation design adapted to the specific geotechnical features of the work site. Centurion Fondation subsequently performed the work for the first building in the housing development.

Client : Immostar General Contractor: Construction Armada

  • Développement immobilier Loges Saint-Nicolas
  • Développement immobilier Loges Saint-Nicolas
  • Développement immobilier Loges Saint-Nicolas
Multi-Action Étiquettes plant Multi-Action Étiquettes plant

L’Ange-Gardien (2015)

Multi-Action Étiquettes plant– Boulevard Sainte-Anne

Centurion Fondation delivered a “turn-key” deep foundation design and construction service. The proposed 135-pile design was verified with dynamic loading tests.

Client : Construction TB4 General Contractor: Construction TB4

  • Multi-Action Étiquettes plant
  • Multi-Action Étiquettes plant
Complexe Les 3 Glaces Complexe Les 3 Glaces

Quebec City (2015)

Complexe Les 3 Glaces – 655, boulevard Pierre-Bertrand

Centurion Fondation designed and built deep foundations adapted to the specific geotechnical features of the work site. The proposed concept included 83 piles was successfully verified with static compression load testing.

Client : Groleau Développement General Contractor: Groleau Construction

  • Complexe Les 3 Glaces
  • Complexe Les 3 Glaces
Complexe sportif Pierre-Laporte sports complex Complexe sportif Pierre-Laporte sports complex

Boucherville (2015)

Complexe sportif Pierre-Laporte sports complex

Centurion Fondation designed and built a metal sheet pile retaining wall exceeding 300 meters to allow for the excavation required for construction of the proposed building. The project involved installing over 450 piles and 100 anchors for the building foundations. Many dynamic and static load tests were performed.

Client : City of Boucherville General Contractor: EBC

  • Complexe sportif Pierre-Laporte sports complex
  • Complexe sportif Pierre-Laporte sports complex
  • Complexe sportif Pierre-Laporte sports complex
Cap-Saint-Ignace (2015) Cap-Saint-Ignace (2015)

Cap-Saint-Ignace (2015)

Bridge P-05080 reconstruction on highway 132

Centurion Fondation installed 54 HP-type driven piles and performed 2 static lateral load tests. The client reviewed the piling layout for the west pour based on Centurion Fondation’s recommendations.

Client : MTQ General Contractor: Construction P.P. Gagnon

  • Cap-Saint-Ignace (2015)
  • Cap-Saint-Ignace (2015)
  • Cap-Saint-Ignace (2015)
Bridge P-18494 reconstruction Bridge P-18494 reconstruction

Frontenac (2015)

Bridge P-18494 reconstruction on highway 204

Centurion installed 60 driven-tubular piles.

Client : MTQ General Contractor: Allen Entrepreneur général

  • Bridge P-18494 reconstruction
  • Bridge P-18494 reconstruction
  • Bridge P-18494 reconstruction
Complexe résidentiel quartier R – 2773 Complexe résidentiel quartier R – 2773

Quebec City (2015)

R – 2773 neighbourhood residential complex, Avenue Sasseville

Centurion Fondation designed and built a Berliner-type retaining wall to allow the excavation work required by the proposed building.

Client : Immeubles Roussin General Contractor: J.M. Demers

  • R – 2773 neighbourhood residential complex, Avenue Sasseville
  • R – 2773 neighbourhood residential complex, Avenue Sasseville
Bridge P-18316 reconstruction Bridge P-18316 reconstruction

Saint-Jacques-le-Mineur (2015)

Bridge P-18316 reconstruction on Montée Saint-Jacques and Montée Du Moulin on Autoroute 15

Centurion Fondation drilled 10 pile shafts 915 mm in diameter by over 20 metres deep, installed 10 passive rock anchors, and designed and installed many driven tubular piles. A static compression load test at 7000 kN, two static traction load tests at 3500 kN and several dynamic load tests were successfully completed. Centurion Fondation took charge of designing the deep foundations of the bridge in collaboration with the project engineering consultant team.

Client : MTQ General Contractor: Groupe Loiselle

  • Bridge P-18316 reconstruction
  • Bridge P-18316 reconstruction
  • Bridge P-18316 reconstruction
  • Bridge P-18316 reconstruction
  • Bridge P-18316 reconstruction
  • Bridge P-18316 reconstruction
  • Bridge P-18316 reconstruction
Verreault Navigation Dry Dock Expansion Verreault Navigation Dry Dock Expansion

Les Méchins (2014-2015)

Verreault Navigation Dry Dock Expansion

Centurion Fondation’s work consisted of drilling 750-mm diameter tubular piles into backfill and rock to form a combined, permanent wall for expansion of the existing dry dock.

Client : Verreault Navigation General Contractor: Hamel Construction

  • Verreault Navigation Dry Dock Expansion
  • Verreault Navigation Dry Dock Expansion
  • Verreault Navigation Dry Dock Expansion
  • Verreault Navigation Dry Dock Expansion
Overpass Construction Overpass Construction

Saguenay (2014-2015)

Overpass Construction on the Chemin de la Grande-Anse and Autoroute 70 Interchange

Centurion Fondation installed 217 driven tubular piles, some over 40 metres long. The piles were driven into a thick quick clay deposit and equipped with Oslo points. Most of the work was performed in winter.

Client : MTQ General Contractor: J. Euclide Perron

  • Overpass Construction
  • Overpass Construction
  • Overpass Construction
  • Overpass Construction
P-17921 Bridge Construction over Duparquet River P-17921 Bridge Construction over Duparquet River

Gallichan (2014-2015)

P-17921 Bridge Construction over Duparquet River

Centurion Fondation installed, drilled the rock and cemented the 8, 1524-mm-diameter caisson piles that form the foundations of the new bridge. Drilling was done in extremely resistant rock, under especially harsh winter weather conditions. Video inspections and five (5) CSL tests were used to confirm the quality of the caisson piles.

Client : MTQ General Contractor: Grandmont et fils

  • P-17921 Bridge Construction over Duparquet River
  • P-17921 Bridge Construction over Duparquet River
  • P-17921 Bridge Construction over Duparquet River
  • P-17921 Bridge Construction over Duparquet River
  • P-17921 Bridge Construction over Duparquet River
  • P-17921 Bridge Construction over Duparquet River
Le Baron Complex Le Baron Complex

Sherbrooke (2014-2015)

Le Baron Complex

Centurion Fondation designed and installed over 500 driven tubular piles that support the building and staged parking lot of the new Le Baron complex in Sherbrooke.

Client : Longer General Contractor: Longer

  • Le Baron Complex
  • Le Baron Complex
Scierie Marcel Lauzon Sawmill Expansion Scierie Marcel Lauzon Sawmill Expansion

East-Hereford (2015)

Scierie Marcel Lauzon Sawmill Expansion

As part of work to expand the Scierie Marcel Lauzon sawmill, Centurion Fondation proposed a concept de driven tubular pile design and drilled 59 piles into rock.

Client : Marcel Lauzon General Contractor: Construction Gératek

  • Scierie Marcel Lauzon Sawmill Expansion
  • Scierie Marcel Lauzon Sawmill Expansion
  • Scierie Marcel Lauzon Sawmill Expansion
  • Scierie Marcel Lauzon Sawmill Expansion
CSST Headquarters Expansion CSST Headquarters Expansion

Quebec City (2014)

CSST Headquarters Expansion

Centurion Fondation designed and built deep foundations adapted to the unique geotechnical features of the work site. The proposed design was successfully verified using static compression and traction load testing.

Client : CSST/EBC General Contractor: Sotraco

  • CSST Headquarters Expansion
  • CSST Headquarters Expansion
  • CSST Headquarters Expansion
Building A – Rue Bouvier Building A – Rue Bouvier

Quebec City (2014)

Building A – Rue Bouvier

In partnership with the designing Engineer and the Client, Centurion Fondation designed and built deep foundations adapted to the unique geotechnical features of the work site. The proposed design was successfully verified using static compression and traction load testing.

Client : Groupe Dallaire General Contractor: Dalcon

  • Building A – Rue Bouvier
  • Building A – Rue Bouvier
  • Building A – Rue Bouvier
  • Building A – Rue Bouvier
  • Building A – Rue Bouvier
  • Building A – Rue Bouvier

BAIE-COMEAU (2014)

Quay Reinforcement Work for the Addition of a Mooring Bollard

Centurion Fondation performed vibratory driving work on the 5, 610-mm-diameter piles needed to strengthen the existing quay to allow for the addition of a mooring bollard.

Client : STQ General Contractor: Les Entreprises R.G. Saint-Laurent

BAIE-COMEAU (2014)

QUAY LANDING EXPANSION

Centurion Fondation designed and installed 4 tubular piles using vibratory driving to support the landing enlargement structure.

Client : STQ General Contractor: Les Constructions Binet

Frontenac (2014)

P-02590 bridge construction on highway 204

Centurion Fondation designed and installed 72 driven tubular friction piles in a hard silt-clay deposit.

Client : MTQ General Contractor: Longer

Espace Fontenelle Espace Fontenelle

Lévis (2014)

Espace Fontenelle

Centurion Fondation designed and installed over 450 driven tubular piles supporting the three buildings of the new Espace Fontenelle complex in Lévis.

Client : Nova Construction General Contractor: Nova Construction

  • Espace Fontenelle
  • Espace Fontenelle
  • Espace Fontenelle
Cimenterie de Port-Daniel Cement Plant Cimenterie de Port-Daniel Cement Plant

Port-Daniel-Gascons (2014-2015)

Cimenterie de Port-Daniel Cement Plant

As part of construction of the marine terminal for the new Mcinnis cement plant, Centurion Fondation installed 99 caisson piles, from 1220 mm to 1372 mm in diameter. Each caisson pile required drilling through rock to a depth of over 12 meters and a diameter of 520 mm.

Client : Ciment McInnis Entrepreneur : Hamel Construction

  • Cimenterie de Port-Daniel Cement Plant
  • Cimenterie de Port-Daniel Cement Plant
  • Cimenterie de Port-Daniel Cement Plant
Logo Centurion Fondation Logo Centurion Fondation

Sainte-Anne-de-Plaines (2014)

REGIONAL KITCHEN, DETENTION FACILITY

Centurion Fondation designed and installed the 70 driven tubular piles required to build the foundations of a new building on the site of the Sainte-Anne-des-Plaines detention facility.

Client : TPSGC General Contractor: Groupe Geyser

Construction of a 2400-mm water conduit in a tunnel Construction of a 2400-mm water conduit in a tunnel

Montreal (2014)

Construction of a 2400-mm water conduit in a tunnel – well using secant piles

Centurion Fondation designed and built the first secant pile well in Quebec. The well, used as a trap for tunnelling work, has an inside diameter of 11 meters and a depth of 34 meters, including 22 meters located in loose soil. The double rotary head drilling technique was used in dense to very dense soils containing rocks and blocks.

Client : Ville de Montreal Entrepreneur : Michaudville

  • Construction of a 2400-mm water conduit in a tunnel
  • Construction of a 2400-mm water conduit in a tunnel
  • Construction of a 2400-mm water conduit in a tunnel
  • Construction of a 2400-mm water conduit in a tunnel

Isle-Verte (2014)

Bridge P-16362 Construction on Autoroute 20

Centurion Fondation installed 132 driven tubular piles for the new P 16362 bridge on Autoroute 20 in Isle-Verte.

Client : MTQ General Contractor: Gervais Dubé

TOURIST QUAY RECONSTRUCTION TOURIST QUAY RECONSTRUCTION

POINTE-AU-PIC (2013-2014)

TOURIST QUAY RECONSTRUCTION

Centurion Fondation performed sheet pile ramming and excavation work, as well as various civil engineering works.

Client : SOGIT General Contractor: Centurion Fondation

  • TOURIST QUAY RECONSTRUCTION
  • TOURIST QUAY RECONSTRUCTION
  • TOURIST QUAY RECONSTRUCTION
Complexe sportif Trane sports complex Complexe sportif Trane sports complex

Boischatel (2014)

Complexe sportif Trane sports complex

Centurion Fondation designed and installed the 138 driven tubular piles that support the new Trane sports complex in Boischâtel.

Client : TB4 General Contractor: TB4

  • Complexe sportif Trane sports complex

MONTREAL (2013)

Construction of a temporary causeway-bridge for replacement of the l’Ile-des-Sœurs bridge

Centurion Fondation drove 178 HP-type steel piles.

Client : TPSGC General Contractor: EBC – Pomerleau

ROMAINE 2 - SECTION 3 (2013) ROMAINE 2 - SECTION 3 (2013)

ROMAINE 2 - SECTION 3 (2013)

735 kV Line

Centurion Fondation drove 126 HP-type steel piles.

Client : Hydro-Québec General Contractor: GLR

  • ROMAINE 2 - SECTION 3 (2013)
  • ROMAINE 2 - SECTION 3 (2013)
  • ROMAINE 2 - SECTION 3 (2013)
Redevelopment interchange A15 / 640 Redevelopment interchange A15 / 640

SAINTE-THÉRÈSE (2013)

Redevelopment interchange A15 / 640

Centurion Fondation built a Berliner-type temporary retaining wall..

Client : MTQ General Contractor: EBC

Reconstruction of Soumande bridge above Autoroute Laurentienne Reconstruction of Soumande bridge above Autoroute Laurentienne

Quebec City (2013)

Reconstruction of Soumande bridge above Autoroute Laurentienne

Centurion Fondation installed 120 driven tubular steel piles. The piles were designed to resist friction loads.

Client : MTQ General Contractor: 2G Construction

  • Reconstruction of Soumande bridge above Autoroute Laurentiennee
Water cannon Water cannon

Quebec City (2013)

Water cannon

Centurion Fondation drilled 11 tubular steel piles at the Port of Quebec.

Client : Arrimage du St-Laurent General Contractor: Arrimage du St-Laurent

  • Water cannon
  • Water cannon
Quay Reinforcement  Wabush Quay Reinforcement  Wabush

WABUSH (2012)

Quay Reinforcement

Centurion Fondation drilled and cemented piles to the rock from the existing quay, and also performed various civil engineering works.

Client : CLIFFS General Contractor: Axor

  • Quay Reinforcement  Wabush